Standing index of U.S. data center power economics
Where in the United States is it cheapest, cleanest and least risky to add the next megawatt of AI load, right now? Thirty-one metros across twenty-four distinct state-and-grid units, scored on federal hourly grid data, published industrial power prices and EPA emissions rates. Every input is public. Every limitation is listed.
Change in the average retail price of electricity to industrial customers, May 2025 to May 2026. The four steepest increases are all PJM states. The two steepest decreases, Texas and Arizona, are the grids that added new generation fastest. We have not seen this number reported anywhere.
Energy only. Pick a market, set your IT load, utilisation and PUE, and the model runs the state industrial retail rate against your facility power. These are scenario estimates, not quoted prices. No hyperscaler pays the state average. The gap between this number and a negotiated contract is the thing worth arguing about.
Modelled annual energy-only electricity cost for a 10 MW IT load at PUE 1.3 and 100% utilisation, using each state's industrial retail rate. Darker bars cost more.
Every metro plotted by cost score against grid stress score. The top-right corner is where you would want to be. Almost nobody is there.
Click any column to sort. Scores are computed over unique state-and-grid units, then joined onto every metro sharing that unit, so the ranking cannot be shifted by listing more metros on one grid. The Metros / unit column shows where that is happening. The AI Power Readiness score is 0.45 × cost + 0.35 × grid stress + 0.20 × carbon. Those weights are our judgement, and the tool lets you change them.
| # | Market | State | Grid (BA) | ¢/kWh | Price YoY | 10 MW / yr | eGRID lb/MWh | Observed lb/MWh | Peak headroom | Grid load 2yr | Cost | Stress | Carbon | AI Power Readiness | Metros / unit | Local interconnection reality |
|---|
Cite the story
Cite the dataset
Data CC BY 4.0. Charts may be reproduced with the source line. Full guidance on the cite & press page.
Check it. Every number here is either computed by our published code from the federal data named above, or traced to the exact sentence of its source in the claim ledger. Every opinion is in the inference ledger with what would prove it wrong.
Corrections. Every change to this story is logged on the corrections page; nothing is edited silently.
On deadline. Joe Robison, publisher: joe@greenflagdigital.com. Same-day answer on any figure. Embargoed early access to major releases for beat reporters.
Disclosures. Run by AI desks under a human publisher; funded by an affiliate hosting site that does not advertise here; the first public deployment of a research harness its operator runs for organizations. All of it on the about page.